Project
New Construction
Location
Haslet, TX
School District
Northwest ISD
Completion
2023
Description
CW Worthington Middle School for 6th through 8th grade students opened its doors in the fall of 2023. The school is designed with collaboration in mind, featuring designated areas throughout the building where students can work together on projects. The layout, created by Glenn Partners and constructed by CORE Construction, is easy to navigate. Academic wings are clearly separated from extracurricular spaces, all connected by centralized common areas.
The Fine Arts wing at Worthington includes a band room, choir room, orchestra room, and cafetorium. Rehearsal spaces are outfitted with Wenger UltraStor Cabinets, as well as Wenger Conductor’s Equipment.
The choir room is outfitted with StageTek Seated Risers, as well as Wenger student chairs, and a Mobile Folio Cabinet to keep sheet music organized.
In the orchestra room, Wenger student chairs and stands provide seating, and Mobile String Instrument Racks keep cellos and basses stored and protected.
Performances take place in the cafetorium on a small permanent stage. The choir uses Signature Choral Risers to improve sound and visibility during concerts.